Your Shopping Cart
GUIDELINES FOR REPLACEMENT OF GENERATING BANK TUBES WITH EXPANDED JOINTS IN TWO-DRUM BOILERS
Provider: TAPPI
Shipping: Available for download - Link will be provided in My ComplianceOnline section
Shipping: Available for download - Link will be provided in My ComplianceOnline section
Price:
$35.00
Product Details
- This Technical Information Paper provides guidelines for the removal and replacement of generating bank tubes with expanded joints in two-drum power and recovery boilers.
- The objective of these guidelines is to minimize the potential for these and other problems by providing mill personnel with the information necessary to develop a well-defined material specification, project scope, and necessary quality control measures for proper execution of this work.
- These guidelines include discussion of both the traditional mechanical rolling method for expanding generating tubes into drums as well as recent developments in the use of hydraulic expansion.
It Provides information on:
- Early contractor involvement.
- Project scope.
- Contractor selection.
- Tube material specification.
- Generating bank tube fabrication.
- Tube removal.
- Expansion measurement.
- Chemical cleaning.
It Benefits:
- Engineer.
- Chemist.
- Project Manager.
- Laboratory Personal.
- Analyst.
- Researchers.
- Maintenance Manager.
Customers Also Bought
- STATISTICAL PROCESS CONTROL OF STARCH VISCOSITY
Price: $35 BUY NOW - Evaluating Glue Lap Adhesive Properties
Price: $53 BUY NOW - ADDENDUM TO CORRUGATING DEFECT TERMINOLOGY MANUAL - DEFECTS RELATED TO THE USE OF FINGERLESS SINGLEFACERS
Price: $35 BUY NOW - Starch Adhesive Trial
Price: $49 BUY NOW - CALIBRATION AND MAINTENANCE OF THE BURST TESTER
Price: $53 BUY NOW - Common Curtain Coating Problems: Causes, Detection and Correction
Price: $53 BUY NOW
You Recently Viewed