Your Shopping Cart
GUIDELINES FOR INSPECTING USED FRP EQUIPMENT
Provider: TAPPI
Shipping: Available for download - Link will be provided in My ComplianceOnline section
Shipping: Available for download - Link will be provided in My ComplianceOnline section
Price:
$35.00
Product Details
- This document describes how “used” iber-reinforced plastic (FRP) tanks and vessels should be formally inspected to determine their condition , which must be known to assess fitness for continued service.
- Three phases of inspection are defined – external inspection when the vessel is in service; external and internal inspections when then the vessel is removed from service. All three inspection phases must be carried out for the inspection to be considered complete.
- These inspection guidelines also can be applied to all laminated construction FRP components, including stacks, hoods, ducts, piping and “dual laminate” equipment; i.e., FRP with an integral thermoplastic corrosion barrier.
- This document does not discuss criteria for repair, repair methods and procedures, or criteria for assessing the fitness-for-service of FRP tanks and vessels.
It Provides information on:
- Safety precautions.
- Basic Structure of FRP Tanks and Vessels.
- Inspection Philosophy.
- Inspection Frequencies.
- Inspection Preparation.
- External Inspections.
- Radiographic Inspection (RT).
- Radiographic Inspection (RT).
- Component Data File.
- Acoustic Emission Testing (AET).
Who will benefit:
- Quality Manager.
- Engineers.
- Maintenance Manager.
- Safety Manager.
- Supervisor.
Customers Also Bought
- PRINTING SECTION
Price: $35 BUY NOW - Troubleshooting the Die Cutting Section
Price: $53 BUY NOW - Reduction or Elimination of Ink and/or Varnish Smear When Printing and Rotary Die Cutting in One Pass
Price: $53 BUY NOW - Folding Section
Price: $53 BUY NOW - Extruded glue mechanism supplement
Price: $49 BUY NOW - Stacking Off the Rotary Diecutter
Price: $53 BUY NOW
You Recently Viewed